Planning a Shallow-Foundation Tunnel Car Wash
A site-survey and layout checklist for shallow-foundation tunnel projects, illustrated by the Singapore raised-conveyor installation.

On this page
Restricted excavation does not answer the tunnel-feasibility question on its own. A project review needs to consider floor levels, conveyor geometry, vehicle access and supporting services together. This guide uses the ASIA WASH Singapore installation as an example while setting out the information to collect for another shallow-foundation site.
Start with a measured site survey
Record the usable building dimensions, finished-floor levels, permissible excavation and the position of entrances and exits. Identify structural features, utility routes and access for maintenance. If the site has restrictions on excavation or building alteration, establish those requirements before selecting equipment or pricing civil work.
Review the complete vehicle route
A raised conveyor changes the relationship between the approach, washing line and exit. Review ramp transitions, vehicle clearance and queuing with the proposed equipment and vehicle range. Consider the route used by long or low-clearance vehicles and the separation of pedestrians from moving vehicles. The engineering team needs the relevant drawings and survey information to assess the arrangement.
What the Singapore project demonstrates
The supplied Singapore project brief describes a 25cm rise in a three-section, twin flat-belt conveyor, together with a reduced foundation depth. It also records design targets of 500 vehicles per day and 50 vehicles per hour. These dimensions and targets belong to that project; they are not standard requirements for every tunnel installation.

Include structure, drainage and utilities
Ask the responsible project specialists to review the support arrangement, site loads and foundations. Plan wash-water collection and treatment connections alongside the conveyor. Confirm electrical supply and space for ancillary equipment. A shallower excavation proposal still requires suitable structural, drainage and installation design; reducing depth does not remove these responsibilities.
A checklist for a useful equipment enquiry
- Site plan and relevant dimensions, including changes in floor level.
- The excavation and building-alteration restrictions that apply.
- Vehicle sizes, clearance constraints and expected arrival patterns.
- The desired wash package and operating targets.
- Water, drainage and power information, plus space for service equipment.
- Responsibility for survey, civil design, equipment installation and acceptance.
Use the case study as a reference, not a drawing
Review the complete Singapore case study for photographs and project-reported results. A similar-looking site may require a different conveyor elevation or support concept. Ask for a site-specific proposal and make sure the scope of any engineering review is clear before proceeding.